Hidd Pipeline Project - Bahrain
Kraken
played a very important role on the HIDD project in Bahrain carried
out by a Joint Venture of Christiani & Nielsen & Nass Contracting.
Kraken was specified to transport a proportion of the pipes on the
surface as well as to provide underwater lightening buoyancy to
reduce the winch load on the 4km x 4 pipes bottom pull.
A most unfortunate fatal accident with the winch in the early stages
of the pull resulted in a complete change of method which involved
the Kraken being used exclusively to not only transport all the
pipe to the lay position up to 7km away, but also to hold it on
the surface while it was welded as well as perform the controlled
sinking into 5/7m of water.

While not without some problems, Kraken performed this quite unexpected and un-planned task, and 5 months later the contract was completed using no other form of pipe transport or control whatsoever.
More project overview sheets are available from Seaflex, if you have a Kraken requirement or question which is not answered within this section please do not hesitate to contact us using the email link below, or use your browsers 'back' button to return to the general Cable & Pipeline Buoyancy Overview.